Latest News

Read More >
10th May 2022

Frodsham Memorial Path

Frodsham Memorial is a much loved, highly visible landmark, it was erected 100 years ago to commemorate the sacrifices made by the people of Frodsham in two world wars. The listed memorial was restored in 2019. HDD have now been appointed by Frodsham Town Council to project manage the design the construction of a new..

Read More >

Read More >
25th April 2022

Infrastructure works nearing completion

HDD are proud to have worked alongside Curtins engineers in designing and overseeing £1.5 million of infrastructure works within West Norwood Cemetery in South London. The infrastructure works are the first phase of a £5.4 million investment in the cemetery funded by the National Lottery Heritage Fund. The contractors Idverde have worked carefully and with..

Read More >

Read More >
1st April 2022

St Stephens Chapel, West Norwood London

After extensive survey and design work and years of planning, works have now started to repair and conserve the Grade 2* St Stephens Chapel and eight other listed monuments at risk in West Norwood Cemetery. HDD are working alongside Donald Insall Associates, to deliver the project assisting with external works improvements and project management.

Read More >
8th March 2022

Shotton Railway Lands

HDD are delighted to be assisting Flintshire County Council with the preparation of a masterplan and levelling up funding application for Shotton railway lands. The area is an important transport hub with 2 train stations and a national cycle path running through it. The proposals aim to improve security, enhance biodiversity, and make the most..

Read More >

Read More >
12th January 2022

Connah’s Quay Docks, Flintshire

We are delighted to have been appointed to prepare a master plan for the historic dock-front at Connah’ s Quay on the River Dee. The Dee in this location is an important wildlife site and designated as a Ramsar. Parts of the dock are listed and there are several listed buildings surrounding the quay. HDD..

Read More >

Read More >
3rd November 2021

Eryri National Park Feasibility Studies

HDD are pleased to announce that we have been appointed by The National Park Authority to produce feasibility studies to develop the rights of way network within Eryri . The work involves consideration of solutions to find ‘missing links’ on popular walking and cycling routes within the Park, to avoid park users having to walk..

Read More >

Read More >
19th October 2021

Bailey Hill – Green Flag Award

HDD along with Bailey Hill steering group are celebrating Bailey Hill’s first Green Flag Award.  The award recognises all the recent work undertaken to create excellent visitor facilities, high environmental standards, and commitment to delivering great quality green space. The ‘Keep Wales Tidy Green Flag Award’ is the international mark of a quality park or..

Read More >

Read More >
29th September 2021

Flint Library Outdoor Space

HDD have been appointed by Aura Wales to design a scheme to develop an area of unused space adjacent to Flint library into an attractive venue for educational and wellbeing workshops. When the space is complete, Aura aim to provide varied activity programme, making use of this new outdoor space, which will aim to be..

Read More >

Read More >
15th September 2021

Camberwell Old Cemetery (Area Z) wins Bali National Landscape Award

We are delighted that Blakedown Landscapes (SE) have won a Bali Award for a Regeneration scheme over £500K for work at Camberwell Old Cemetery. The scheme was designed and project managed by Harrison Design Development. Well done to Blakedown Landscapes on winning the award and constructing this ambitious scheme, delivered with the highest sensitivity, and..

Read More >

Read More >
24th August 2021

Bailey Hill Play Area

HDD are working with the Bailey Hill Steering Group to design and project manage the implementation of a new play area. Exciting discoveries of a medieval archaeology within the existing play area mean that the play area has to be re-located to another part of the site. Bailey Hill is the site of a Norman..

Read More >

Read More >
18th August 2021

Camberwell Old Cemetery – Biodiversity Gain

Now construction works are complete, nature is moving in to Camberwell Old Cemetery. HDD designed and project managed over £1 million worth of remediation works, earth modelling and final landscape finishes to create new burial areas at Camberwell Old Cemetery in London. The scheme was carefully designed to encourage biodiversity, and it is looking very..

Read More >

Read More >
3rd August 2021

Bailey Hill – Final Works Now Complete

HDD have been acting as lead consultant and project manager for the Bailey Hill Project for over 10 years. Works are now finally complete and all the finishing touches in place, with the final fitting of the Cottage facias and shutters designed by HDD in place. The site is really looking great, ready for its..

Read More >