1st February 2025

BEFORE

AFTER
Amazing to see progress on the new Hubbard Road gates at West Norwood Cemetery. The entrance has been sealed and blocked with a brick wall for over a century. HDD have worked alongside DIA architects to design the new entrance and gates. The gate design matches the Tite gates at the entrance to the cemetery and have been fabricated by Calibre. The new entrance is due to be completed and opened in the spring.